Q:
|
How long will it take to raise the frame and install the panels? |
A:
|
A 2500 SF timber frame averages about 2-4 weeks depending on location. The size
and complexity of the building - as well as the site conditions and constraints
- will affect the time it will take. Regardless, timber frame/SIP structures can
be weather-tight much quicker than conventional construction.
Click here to see our sips
panels.
|
|
|