Q:
How long will it take to raise the frame and install the panels?

A:
A 2500 SF timber frame averages about 2-4 weeks depending on location. The size and complexity of the building - as well as the site conditions and constraints - will affect the time it will take. Regardless, timber frame/SIP structures can be weather-tight much quicker than conventional construction. Click here to see our sips panels.